*
  SELECTED PERSONAL PORTFOLIO

FLUOR/TRS-FEMA

VA

W.E.BRAZLEY
SOMERVILLE
SOMERVILLE

DCDDC
KPS GROUP
KPS GROUP
MAXWELL AFB
MAXWELL AFB
Architect, Contractor, Consultant
CONSULTANT
Bernard Johnson, Architects & Engineers
BERNARD JOHNSON
Kevin Roche John Dinkeloo
KEVIN ROCHE JOHN DINKELOO
Videriksen, Donald, Pedersen
CALIFORNIA ARCHITECTS
Richard & Dion Neutra
RICHARD AND DION NEUTRA
Merrill Development Co.
MERRILL DEVELOPMENT
Expectations an other employment
OTHER EMPLOYMENT

ARCHITECTURAL HISTORY
REFERENCES IN ZIP FILE
CV IN TEXT
BACKGROUND
CV IN WORD FORMAT
FORENSIC ARCHITECT
pwdickson@white-phoenix.com
BACK
OTHER EMPLOYMENT:

Present: Practicing Architect, Texas 

2008-09: TDCJ, Architect III, Facility Management.

2008: Contract Consultant to FLUOR and FEMA for Hurricane Ike 

2007-08: Facility Management CTVHA, Waco

2006-07: Contract work with Contractors

2005-06: Contract Consultant to FLUOR and FEMA in Florida and with the Health and Research Group in Louisiana.

2005: Central Texas Veterans Administration Healthcare System, Architect

 2004-05:  Work with Houston Contractors and HISD Teaching Special Education

 2004: Horizon Architects: Architect & Construction Manager

 2003: Marous Brothers Construction Company, Architect & Director of Design Build

 2003: State Architect for the USDA-RD Wisconsin.

 2002:  Independent consultation with several Architects and Contractors in Chicago, Wisconsin, and Alaska. 

 2001-02:  DMAC & W.E.Brazley & Associates, Senior Project Architect & Project Manager for the Gary Public Safety Facility 

 2000-01:  SOMERVILLE, INC., Green Bay, WI, Senior Architect, Multiple Projects

 1999-00:  DCDDC., Architect and Corporate Director for Design-Build, Multiple Projects

 1998-99:  KPS Group, Birmingham, AL,, Architect, Account representative for the Birmingham International Airport.

 1997-98:  DOD, Maxwell AFB, Montgomery AL,, Architect-Multiple Projects

 1984-97:  Paul Langley Co.; Property Development & Property Management.

 1975-97:  Self-Employed Consultant, Architect, Contractor, Property Manager.  Services included: Facility analysis, Architecture, Design-build construction, Construction management, Programming, and Business process re-engineering. 

 1974-75:  Bernard Johnson Inc., Architects and Engineers, Project Architect/Manage for HEW Remodeling, Washington DC.

 1972-74:  Kevin Roche John Dinkeloo, Architects, Project Architect-Multiple Projects.

 1970-72:  Richard and Dion Neutra Architects, Designer/Job Captain.

 1965-70:  Merrill Development Company, Designer/Project Manager.

 1961-65:  USN Submarine Service: Honorably Discharged, P.O. 2nd Class

PARTIAL PROJECT SUMMARY 

Responsible for numerous design-build clinical and non-clinical projects, and for multiple contract design and construction projects for the Veterans Administration in Temple Texas.

Account Manager-Facilities for the Birmingham International Airport, Birmingham Alabama.  Master Planning, Facility design and management, Account Management, and Construction Management for numerous land side & air side projects, including a $35mil parking deck, terminal re-roofing, Interior renovations, and Cargo facility and Corporate Terminal relocation.  Airport Master planning, Passenger Terminal Master Planning, and traffic planning.  Member of an Anchorage International Airport team as Project Architect, USKH, Anchorage, AK

Public Safety Facility and Jail for Gary IN, Project Manager for Architecture and Construction: Involvement included Re-programming, Schematic Design, and completion of Construction Documents for a new Public Safety Facility for Gary IN.  Resolved numerous organizational conflicts between the city, its departments, and independently contracted consultants to produce design and construction documents.  Reprogrammed facility to satisfy program requirements of the city.

Kewaunee Nuclear Power Plant Design, construction documents, & specifications for multiple building envelope projects maintaining continuous plant operation, 0% down time.  Value engineered projects from $30k to $300k.

Re-Programming, Conceptual Design, & Site Planning for the Portage County, Lincoln Center for the Aging in Stevens Point, WI.  Programming & Site Planning for Schreiber Foods in Wisconsin Rapids, WI. & Woldt Cheese in New London, WI.  Programming, Site Planning, process engineering, and Value engineering for multiple industrial facilities including R.B.Royal and ERDA in Wisconsin.

Fast-track design-build of telecommunication C/O & data processing facilities in nine states.  Designed and completed construction documents for 93,000 s.f. Central office telecommunication facility for FOCAL Communications in less than 3 weeks. Various facilities under my supervision were located in NY, NJ, PA, TX, MI, CA, OH, & IL.  Much of the work involved the design and construction of security and emergency support systems as well as building envelopes.

Department of HEW Buildings, Washington, D.C.  Architect and project manager.  U.S. Department of HEW Buildings, Washington, D.C.  $65 million [1974 $] remodeling: Project involved the renovation and remodeling of 3 WPA era buildings to accommodate the increasing presence of the Dept. of HEW for the following 3 decades.  Project responsibility included identifying compliance issues regarding [at that time] newly implemented energy and accessibility contemporary and future technological requirements, and providing comfortable, safe, and contemporary accommodations for the staff of the Department of Health Education and Welfare.  I was  Personally responsible for Realizing 23% savings in anticipated  construction costs through design and mechanical innovations while improving the net quality and value of the delivered product.   Achieved a 75% savings in our in-house production costs.

Project Architect, Responsible for curtain wall design and detailing Metropolitan Museum and the United Nations Development Corp. Buildings, NYC.

Project Architect/Job Captain for the below grade structures of the Federal Reserve Bank Headquarters in NYC.  Responsible for infrastructure research and coordination of the 10 Story, 70 feet below sea level subterranean structure. 

Owner’s representative for the College Life Insurance Headquarters.

Huntington Beach Central Library and Cultural Resource Center, Huntington Beach, Calif. Job Captain & Project Designer.  Responsibilities included programming, conceptual design, schematic design.  Developed a radically new and effective concept for library organization based on efficient and accessible information storage and retrieval.  Anticipated and accommodated the future use of computer terminals and electronic data storage,

Project Architect Responsible for the Planning, Design, and Construction Documents for two ten story residential towers, on budget, in two weeks total turn around time.  Completed documents included two fully coordinated concepts for the mechanical, electrical, and plumbing systems.  Project location: Redondo Beach, California.

Designed and constructed the lowest cost house ever authorized and built under the FHA-235 Program. Use of REDI-FORM, a patented concrete forming system, and prefabrication techniques resulted in a 20% reduction in construction costs and a unique atrium plan.   Managed other residential construction projects and participated in the design and construction of the machinery to fabricate REDI-FORM. 

Designed, developed, constructed, and managed Houston's first Residential & /Commercial Lofts in downtown Houston, Texas.  Developed new business enterprise consisting of a musicians rehearsal facility.  The two building project, includes one of the oldest buildings in Houston

Architect, contractor, developer.  Private practice included but not exclusive to design-build projects, construction management, and business/facility analysis.  Provided as a professional or consultant: Architectural Services, programming, and business re-engineering services as well as fast-track and design-build construction management for most types of commercial and residential construction.  My mission was and continues to be to help my clients achieve maximum value from their present and future physical assets.

REPRESENTATIVE PROJECTS AS AN INDEPENDENT PRACTITIONER

1. CMS, Houston Rehabilitation Institute, Houston, Texas.   Provided facility analysis, programming, conceptual design, and preliminary facility plans for a proposed outpatient facility and for remodeling of the existing in-patient facility.  Developed a fast track/design build construction proposal with two different contractors to save over 750k in net costs on a project with a construction cost of less than $200k. . 

2. Designed and Constructed Active solar powered ranch including residence and outbuildings, VanWoerden Ranch, Cat Spring, Texas.

3. Developed  prototype design for full service Atlantic Richfield Service Stations, Atlantic Richfield Corporation. A franchised fast food restaurant, and Meat Market chain. 

4. New manufacturing and office facilities for PRAXIS, a Houston based chemical Industry control and metering systems manufacturing company.  Provided facility analysis, business process re-engineering, programming, schematic design, and property acquisition consultation.   Developed a fast track/design build proposal for implementation that allowed sequential/incremental occupancy. 

5. Designed and Constructed 4 art galleries in Houston, Texas: Willhelm Gallery, Plaza Gallery, Muth Gallery, and the Bienville Gallery.  All contracts were design-build.

6. Completed numerous light commercial and residential design build projects and acted as Consultant for Business Facility Analysis and for Roofing and Foundations on many commercial and multifamily projects in the Houston area.

7. Redesigned and constructed with the assistance of resident artists, the multistory gallery living quarters and working environment for a severely disabled gallery owner; Bienville Gallery, Magazine Street, New Orleans, LA.

8. Extensive involvement in opposition to a zoning referendum in Houston, TX.  Extensive involvement with community organizations involved concerned with the establishment of a Historical Warehouse District in Houston, TX.

9. Graduation Thesis on the Practice and Philosophy of  Urban Transportation Planning [copies available on request]

 

 pwdickson@white-phoenix.com